Sand washing machine level maintenance importance

The first-level maintenance of the sand washing machine is mainly carried out by the operator. If necessary, the maintenance personnel are assisted by the maintenance personnel. The main part is to inspect and disassemble the equipment, clean the dirt, and clear the pipeline and waterway. At the same time, the belt and the screen are replaced. The maintenance time of the net, hammer and other parts is generally about 2 hours.
The maintenance of the sand washing machine generally includes daily insurance, weekly insurance and primary maintenance.



The daily maintenance of the sand washing machine equipment is mainly completed by the operation workers on the day of the day. When the equipment is handed over, add the lubricating oil according to the regulations, wipe the equipment, and check whether the switch position is flexible and correct, and whether the functions of the equipment are smooth during the idling. . Whether the indicators are normal during the operation of the sand washing machine, and the problems are solved in time.



Weekly maintenance is carried out once a week to maintain the appearance of the equipment, control of the transmission, lubrication, electrical systems, etc.



The first-level maintenance of the sand washing machine is mainly carried out by the operator. If necessary, the maintenance personnel are assisted by the maintenance personnel. The main part is to inspect and disassemble the equipment, clean the dirt, and clear the pipeline and waterway. At the same time, the belt and the screen are replaced. The maintenance time of the net, hammer and other parts is generally about 2 hours.



After the maintenance, detailed records will be made, and the hidden dangers will be recorded in detail for archiving. The main purpose is to eliminate the hidden troubles and extend the service life of the sand washing machine.
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn

Galv Open Eyebolt

Product Name:Galv open eyebolt

Key words:Galv open eyebolt on cross arm and pole,Power galv open eyebolt,Open eyebolt for galv

Application: For deadending wire and guys strand on cross-arms,poles,or building.Used wityh flat washer and curved flat washer.

Size:M16x150

Part No.: Q.Q.Q.765924

Material elongation:Q345,Q235

Finished: Galvanized,HDG,Plain,Painting,Dacromet,Electrogalvanizing,Oiled,Phosphorization,etc

Place of origina:China

HS Code:730820

Trademark:ZBRF

Color:Customized

Part:Power,Galv

Transport Package:Plastic Bag or Gunny bag and Wooden Case

Port of shipment:Shanghai Port,Taicang Port

Certification:CE,SGS,A.S

Tensile strength ≥410Mpa

Yield strength ≥280Mpa

Elongation≥22%

Open Eyebolt On Crossarm,Open Eyebolt On Pole,Power Galv Open Eyebolt,Open Eyebolt For Galv

TAICANG ZHONGBO RAILWAY FASTENING CO., LTD. , https://www.railfastener.com